| 1. | Review mechanical drawings and specifications 审核机械图纸和规范。 |
| 2. | Drawing and specification contract 图则规格合约 |
| 3. | Construction drawings and specifications are then prepared for construction purposes 然后,制定建筑图及规格,供施工之用。 |
| 4. | Construction drawings and specifications are then prepared for construction purposes 然后,制定建筑图及规格,供施工之用。 |
| 5. | Review fabrication drawings and specifications and advise production departments of any problems , which may occur 审查生产图纸和标准,并提醒生产部有关可能出现的问题。 |
| 6. | According to drawing and specification to do the inspection for each working procedure , to ensure the process quality 依据图纸和检验规范要求,负责产品生产过程中的工序检验,保证过程质量。 |
| 7. | Review fabrication drawings and specifications and advise production and qa / qc departments of any welding problems that may occur 审查生产图纸和标准,并提醒生产部和质控部有关可能出现的焊接问题。 |
| 8. | The development manager is obligated to undertake and coordinate the completion of drawings and specifications which are free of conflicts and ambiguities 开发管理人必须承担和协调图纸和技术说明书的完成,并确保其中无分歧和意思含混之处。 |
| 9. | For ( checking compliance of ) all drawing and specification characteristics , inspection results will be submitted to kai quality assurance 供应商(销售方)对第一件产品进行检验,并将检验报告递交kai公司品质保证部门以检验其是否符合图纸和规格要求(特征) 。 |
| 10. | The development manager shall verify and coordinate the drawings and specifications of all sections or trades for interrelated work as required for proper and complete performance of the work in accordance with the contract 开发管理人应为相互关联的工程对图纸和技术说明书中的所有部分或专业进行确认和协调,该等相互关联的工程对于根据本合同妥善完整地履行工程是必要的。 |